NMCS Work Programme 2015      Version 1 dated 22 03 2015

Small Jobs

Assay House door seals – install

Hodgson’s shop window – repair broken pane

Replace putty on various windows and repaint

Repaint Assay House upstairs door

Paint Assay house interior

Medium Jobs

Dismantle panels in Barracks ground floor and tidy up room

Move Eimco to better position in Barracks

Moving deck winch under cover in Barracks

Pointing – assorted places with lime mortar

Barracks floor – replace floorboards near entrance

Assay House South doorframe – replace lower sections

Hodgson’s High Level shop – fix chimney lead flashing

Large Jobs

River wall below Smallcleugh I complete emergency repairs

Barracks North Door & Frame – strengthen rotting door and frame

Flagstones outside Barracks South door – lay flagstones when SMC confirmed

Ongoing Jobs

Pothole filling – access track

Weeding – particularly smelting mill area, and remove thistles anywhere

Litter picking

Projects

North Explosives Store: install roof timbers and roof, construct two doors and             frames, install floor and interior walls, complete wall reconstruction

Restore Eimco

Restore deck winch