Brewery Shaft
The light string was pulled from the shaft and the bulbs changed to led type. Everything worked fine. Power supply is now from a generator as the mains supply has been removed.
North Explosives Store
The temporary winter roof was removed, which took longer than expected. The walls are in good condition underneath. After much cutting and discussing, the new outer door frame was installed and the site tidied up.
Smelting Mill
Sorting of the stone pile continued, window blind installed in the Assay House, rubbish cleared from the mill area.